The backup laptop has a pentium III processor and a whopping 192 mb of ram. whywhyWHY did I keep it?
It never fails – fill the bowl with bleach and everybody has to go potty RIGHTNOW.
Flooring, round 2 coming up.
Dear Teen Driver: I don’t care how loud the bass is thumpin. Yer still drivin ya mama’s minivan.
Round 2 of laptop maintenance. This time for a BADLY needed ram upgrade.
I feel naked without my phone. So I spent money I don’t have on stuff I don’t need to compensate.
If you MUST use your webcam to take a photo, turn your screen brightness down after you compose. BLUE GLARE BAD!!!
Molding’s done. (did you REALLY think I’d leave it THIS close to done??!!??) Only one thing left to do – shower and relaaaaax. For about …
Just smashed my finger. An entire week of hammering on that floor and on the LAST day I smash it.
Lol. Forgot about re-placing the molding. Tempted to leave it.
Done.
On the home stretch – now I hafta rip the boards down to 4″ wide.
I just shattered the tapping block. RAWR!
Finishing the flooring. Didn’t need to remove the now totally stripped screws after all.
Yes, times HAVE changed. But wearing a headful of curlers to the store is still a huge fashion don’t.
Fresh From Twitter
Reply